For demolition, refurbishment and heritage projects

    Lead paint disturbance is regulated under CLAW. Survey first. Sample during.

    Pre-disturbance lead paint surveys, personal lead-in-air sampling during stripping and demolition, and surface wipe testing — under the Control of Lead at Work Regulations 2002.

    • UK-wide since 2013
    • Independent assessments
    • ISO 9001 accredited
    • Practical control advice

    What this means for you

    Evidence you can act on and defend.

    • Measured exposure evidence

      Data suitable for HSE, insurers and audits.

    • Independent assessment

      Occupational hygiene review of real exposure risk.

    • Practical control recommendations

      Prioritised actions based on risk and operational practicality.

    • Compliance support

      Evidence to support COSHH and internal governance.

    Speak with a lead paint specialist

    0800 433 7914

    sales@sysco-env.co.uk

    Mon–Fri · 08:00–18:00 · Independent advice · Fixed-price scope

    Typical response: same working day

    Minimal operational disruption
    Sampling during normal activities
    Clear fixed scope before attendance
    Action-focused reporting

    What happens next

    Most lead paint surveys are completed in 1–2 days on site.

    We attend with XRF and sampling equipment, screen representative paint finishes, take confirmatory samples and report with a clear plan for disturbance works.

    No unnecessary disruption. No generic paperwork. No unnecessary complexity.

    • Whether exposure is controlled

      A clear yes or no, backed by measurement.

    • Where the highest risks are

      Locations, tasks and roles ranked by exposure.

    • What actions matter most

      A prioritised plan you can budget and schedule.

    Accredited
    ISO 9001 Registered Company
    Members of
    British Occupational Hygiene Society (Affiliate Member)ConstructionlineCHAS Accredited ContractorSafeContractor Approved
    Testing Competency
    AIHA Proficiency Analytical Testing Programs

    What you get

    Four answers. One clear plan.

    You need to know what your workforce is exposed to, whether your controls are effective, what actions matter most, and how to demonstrate control confidently.

    That is exactly what we deliver.

    01

    Know what your team breathes

    We measure real exposure on the people most at risk, using validated methods for lead paint — no guesswork.

    02

    Know where you stand legally

    We compare measured exposure to the CLAW lead-in-air OEL of 0.15 mg/m³ and the action / suspension blood-lead levels.

    03

    Know if your controls work

    An independent review of your LEV, ventilation, RPE and work practices — what's effective and what isn't.

    04

    Get a report you can act on

    Clear findings and a prioritised action plan suitable for HSE, insurers and operational management.

    Typical environments·Demolition·Heritage restoration·Refurbishment contractors·Local authorities·Property managers·School & hospital estates

    Why clients call

    If any of this sounds familiar, you're in the right place.

    1. 01

      An auditor is asking

      HSE, your insurer or a client wants evidence — not assurances

      We provide measured lead paint data and a clear technical report that resolves the issue quickly.

    2. 02

      Your team is worried

      Operatives are reporting concerns or symptoms

      We attend site, quantify workforce exposure and provide clear evidence of current risk levels.

    3. 03

      You suspect a problem

      You know there's a risk and you want measured data before it becomes a crisis

      We quantify exposure, assess it against current limits and provide a prioritised corrective action plan.

    What we answer for you

    Three questions, settled.

    Where your people are exposed
    We map the tasks, areas and shifts where lead paint matters, then sample what your team actually breathes — not a generic site average.
    Whether your controls are working
    An independent review of your LEV, ventilation, PPE and work practices — what is effective and what requires improvement.
    What you need to fix first
    A prioritised, costed action list — the smallest set of changes that gets you compliant and measurably safer.

    How we work with you

    From your first call to your action plan.

    1. 1

      We listen first — your site, your concerns, your deadline.

    2. 2

      We walk the workplace with your team to see exposure as it actually happens.

    3. 3

      We sample on the people most at risk, using validated occupational hygiene methods for lead paint.

    4. 4

      We assess your existing controls honestly — what's working, what isn't.

    5. 5

      You receive a clear technical report suitable for operational, compliance and regulatory readers.

    6. 6

      We hand you a prioritised action plan you can budget, schedule and defend.

    Typical survey outputs

    What you receive at the end of the engagement.

    • XRF screening map
    • Laboratory paint confirmation
    • Personal lead-in-air results
    • Surface wipe results
    • RPE / control review
    • CLAW-aligned report
    • Disturbance method statement support
    • Clearance certificate (where applicable)

    Client testimony

    Sysco's pre-disturbance lead paint map saved us from finding it at the wrong moment in our heritage restoration.

    Project director

    UK heritage contractor

    Typical environments we assess

    Wherever lead paint risk affects your people.

    • Demolition & refurb
    • Heritage buildings
    • Industrial premises
    • Schools (pre-1980)
    • Healthcare estates
    • Hospitality refurbishment

    Background

    Lead paint, in detail.

    When lead paint is likely

    Pre-1992 industrial paint, pre-1965 domestic paint, and many marine and rail coatings are likely to contain lead at significant percentages. Heritage and church paintwork commonly contains very high lead content.

    Pre-disturbance survey

    XRF screening across representative finishes, with confirmatory laboratory analysis of paint scrapes. The output is a paint-by-paint map of which surfaces contain lead and at what concentration, used to plan disturbance works.

    Controls during disturbance

    Wet methods, on-tool extraction, full enclosure for high-risk operations, prohibition of dry sanding and burning-off, RPE selection by face-fit, separate change facilities and rigorous decontamination, plus blood-lead surveillance for operatives.

    Related services

    Often assessed alongside lead paint.

    Common questions

    Lead Paint — FAQs.

    Quick answers to the questions we hear most from operations, HSE and procurement teams.

    Does lead paint trigger CLAW?
    Yes — disturbance of lead-bearing paint is work with lead under CLAW and triggers exposure assessment, control and surveillance obligations.
    Do you do XRF and lab analysis?
    Yes — XRF for screening and laboratory analysis for confirmation and quantification.
    Personal sampling during stripping?
    Yes — IOM personal samplers with ICP/MS analysis.
    Wipe sampling for clearance?
    Yes — to ASTM/HSL methodology after works.
    How quickly can you mobilise?
    We'll confirm a realistic mobilisation date with you at quote stage, scoped to the works.
    Where in the UK?
    Nationwide UK coverage.

    Speak with a lead paint specialist

    Tell us your project. We'll scope the survey.

    Tell us

    • building age and surfaces of concern,
    • scope of disturbance works,
    • operatives at risk,
    • and your reporting deadline.

    We will provide

    • a clear scope,
    • fixed quotation,
    • proposed attendance strategy,
    • and expected reporting timeframe.

    Send us a brief

    Outline the sites, tasks and timelines of concern — we'll reply with a clear scope and fixed quotation.

    Response within one working day
    UK-wide site coverage
    Fixed-price scope, no obligation
    Mon–Fri · 08:00–18:00