About Us

Shop

Shop Basket

My Account

Blog    |    Case Studies

Accreditations

Our Customers    |    Testimonials

Our Customers


Make a Payment


Careers


How long does a mould & damp survey take?

On average, a standard mould and damp survey takes between one and three hours. The length of the survey depends on the size of the property and the severity of the problem. A small flat with a single damp patch may be done quite quickly, while a large house with multiple problem areas takes longer. The surveyor will check visible signs, take moisture readings, sometimes collect air or surface samples, and then prepare a detailed report. You don’t usually need to do much to prepare, but it helps if rooms are accessible and furniture isn’t blocking problem areas.

Get Back To Me

Call us on 0800 433 7914, click here to email us with your enquiry, or provide your name & email address below and we'll email you: