







The number of systems you have, their complexity, and your location all affect the price. Large industrial sites with several systems could cost much more than a basic single-point extraction, which might just cost a few thousand rand.
The quality of the inspection is more important than the cost. A cheap test that omits necessary metrics is a false saving because, should the system fail, you could be legally exposed and your employees could be in danger.