About Us

Services

Shop

Laboratory

Blog

Case Studies

Accreditations

Testimonials

Our Customers

Contact

Our Customers



Shop Basket

My Account

Make a Payment


Careers

Terms

Privacy

Returns and Refund Policy

Cookies

Terms  |  Privacy  |  Cookies

Case Study: Lead Reassurance Testing - Ensuring Safety and Compliance | Sysco Environmental

Case Study: Lead Reassurance Testing - Ensuring Safety and Compliance | Sysco Environmental

Background

 
Historically, lead-based paints were extensively used in industrial applications, including the coating of railway infrastructure. The reasons for its use were largely its durability and corrosion resistance. One such application was the painting of railway repair sheds. These massive structures were typically coated with lead-based paints to protect them against the elements and wear. Over time, however, these paints have degraded, weathered, and chipped, causing the lead to become a potential hazard.
 
Currently, there is a trend to repurpose old railway repair sheds into new public spaces, such as markets, galleries, or communal workspaces. This redevelopment, while promising, comes with a significant challenge. These structures, due to their historical use of lead-based paints, often contain hazardous materials that must be safely removed before the redevelopment work can commence.
 
Lead, a toxic heavy metal, poses significant health risks to humans, especially children. Even at low exposure levels, it can lead to cognitive and physical impairments. The primary concern arises during refurbishment and redecoration processes, where the disturbance of lead-based materials can release lead particles into the air, causing potential health hazards. It is essential to carry out a thorough lead reassurance test to ensure the safety of the workers involved in the redevelopment, as well as the future users of the space.
 

Project Overview

 
The project in question involved an old railway repair shed, a heritage structure located in a densely populated urban setting. The building was in the early stages of redevelopment to be transformed into a public space. Before the redevelopment work could commence, the hazardous materials present, including the heavily weathered and deteriorated lead-based paint, had to be removed.
 
The lead-based paint was being stripped from the interior walls of the shed using a wet sandblasting technique, which reduces the amount of airborne lead particles. However, given the potential hazards associated with this work, strict safety measures were implemented. Four operatives were actively working in the semi-enclosed area during this process.
 
Apart from these operatives, a large number of contractors were working in the vicinity, outside the immediate containment areas. Ensuring the safety of all workers was of paramount importance. Therefore, the project's priority was to implement and maintain stringent controls to prevent lead contamination.
 
Our responsibility was twofold. First, we needed to ensure that the workers directly involved in the lead removal process were adequately protected and not exposed to hazardous levels of lead. Secondly, we needed to make certain that lead particles were not escaping the containment area and affecting other areas where contractors were working.
 
This dual focus ensured not only the safety of all individuals on-site but also the effective containment and management of lead-based materials to minimize potential health risks and environmental impact.

 Findings

 
During the stripping process, Sysco Environmental continuously monitored the levels of lead in the ambient atmosphere within the semi-enclosed area. The results were reassuring: all recorded concentrations of airborne lead were below 5% of the Workplace Exposure Limits (WELs). This indicated that the control measures implemented were effective, and the workers involved in the stripping process were adequately protected from lead exposure.
 
Simultaneously, testing was also performed in areas outside the containment area, where other contractors were working. Remarkably, the levels of lead dust in these zones were not detectable. This confirmed that the containment procedures were robust, successfully preventing any leakage of lead dust into the broader work site.
 
Furthermore, Sysco Environmental demonstrated its cutting-edge capabilities by analysing the samples directly on-site. This efficient approach provided immediate results, enabling the real-time adjustment of safety protocols if necessary. Such proactive measures are crucial in dynamic environments, ensuring a rapid response to any fluctuations in lead levels and maintaining a consistently safe work environment.

Conclusion

 
The comprehensive monitoring conducted by Sysco Environmental during the lead stripping project has demonstrated both compliance with regulatory limits and adherence to best practices in managing lead exposure. The results of the monitoring program provided reassurance that both the operatives directly involved in the stripping process and the contractors working outside the containment areas were not exposed to any significant risks associated with lead.
 
The utilization of on-site analysis capabilities proved to be critical in ensuring a proactive approach to safety. By analysing samples directly at the work site, any potential issues or deviations from safety standards could be identified promptly. This immediate feedback allowed for swift corrective actions to be taken, minimizing any potential risks and ensuring the continuous protection of all personnel involved.
 
Sysco Environmental’ s commitment to upholding the highest standards of safety and their ability to perform on-site analysis highlight their expertise in the field. Their comprehensive monitoring approach, combined with their swift response to emerging concerns, underscores the value they bring to projects involving hazardous materials. The successful completion of this project not only ensures the safe redevelopment of the old railway buildings but also serves as a testament to Sysco Environmental’ s commitment to the health and well-being of their clients and the surrounding environment.

OUR EXPERT

Tomas Gab

0800 433 7914

At Sysco Environmental, we prioritize site safety during lead removal projects. Our comprehensive approach, including monitoring, on-site analysis, and swift corrective actions, ensures that workers are protected and compliance is maintained. We understand the importance of managing lead contaminants and preventing their escape to ensure a safe working environment. With our expertise and commitment to safety, we provide effective solutions for lead removal, minimizing risks and ensuring the well-being of all involved. Trust us to deliver reliable and compliant lead removal services tailored to your specific needs.

Ask us a question